Future Projects
412 Mallory Way
The scope of work includes the remodel of 25 existing residential units(eligible district contributors)and addition of 33 new residential modular units on the site, along with various site improvements. All existing residential buildings will remain in their current locations. The laundry/storage building (non-contributing) will be converted to three residential units. Structures and site features that will be demolished include the infilled pool and associated storage shed and shade canopy, the shuffleboard court, and two concrete pads. The culvert and lined creek will be retained, along with many of the mature trees. Some trees will be removed for fire safety compliance. The driveway will be realigned but will retain the semi-circular arc in front of the existing residential buildings, and will be extended to complete a loop.
Modular Units: Samara
Learn More312 W. Aliso – Cottages Among The Flowers
Nestled in the heart of Ojai, 312 W. Aliso, Cottages Among The Flowers, is a thoughtfully reimagined community that blends historic character with modern comfort. The project preserves the charm of the original cottages while introducing enhanced amenities, updated infrastructure, drought tolerant landscaping, a remodeled garage structure, and two affordable units on the second floor of the garage to create a warm, inviting residential setting. Phase 2 of the project has commenced as of Spring 2026.
Learn More141 N. Ventura Avenue
Conversion of Existing 15,000 SF Commercial Building into Mixed Use Retail & Residential Apartments.
Includes two (2) Retail Suites Fronting Ventura Avenue and Nine (9) New Apartments:
- Seven (7) units at existing second level
- Two (2) units proposed at rear ground level
- 1,800 SF of Ground Floor Commercial Retail
- Parking
Learn More
